The Federal Bureau of Investigation's Pre-Acquisition Planning for
and Controls Over the Sentinel Case Management System

Audit Report 06-14
March 2006
Office of the Inspector General


Appendix 4

FBI’S LCMD IT Systems Life Cycle


FBI’S LCMD IT SYSTEMS LIFE CYCLE

[Chart Not Available Electronically]


LEGEND

AOR Annual Operational Review MNR Mission Needs Review
APR Acquisition Plan Review OAR Operational Acceptance Review
ATO Authority to Operate ORR Operational Readiness Review
ATT Authorization to Test PDR Preliminary Design Review
CDR Critical Design Review PTRR Product Test Readiness Review
CIR Contract Implementation Review RCR Requirements Clarification Review
CMB Change Management Board SAR Site Acceptance Review
CRB Contract Review Board SCR System Concept Review
DCR Design Concept Review SSAR Source Selection Authorization Review
DR Disposal Review SSR System Specification Review
DRR Deployment Readiness Review STRR Site Test Readiness Review
EAB Enterprise Architecture Board Sys
TRR
System Test Readiness Review
FDR Final Design Review Board TR Termination Review
IATO Final Design Review Board TRB Technical Review Board
IMPRB Investment Management Project Review Board      